Initially, the Jai Hind metro station was prepared to be elevated. Nonetheless, the AAI objected the elevated stretch up for the airport may well pose a menace to plane, And so the route was more reworked as well as station was shifted underground, 150 m through the Airport terminal making. For https://wardg431rgu7.wikilinksnews.com/user